Avoid extra work by continuing on to the next rt_rq if the highest
prio task in current rt_rq is the same priority as our candidate
task.
More detailed explanation: if next is not NULL, then we have found a
candidate task, and its priority is next->prio. Now we are looking
for an even higher priority task in the other rt_rq's. idx is the
highest priority in the current candidate rt_rq. In the current 3.3
code, if idx is equal to next->prio, we would start scanning the tasks
in that rt_rq and replace the current candidate task with a task from
that rt_rq. But the new task would only have a priority that is equal
to our previous candidate task, so we have not advanced our goal of
finding a higher prio task. So we should avoid the extra work by
continuing on to the next rt_rq if idx is equal to next->prio.
Signed-off-by: Michael J Wang <[email protected]>
Acked-by: Steven Rostedt <[email protected]>
Reviewed-by: Yong Zhang <[email protected]>
Signed-off-by: Peter Zijlstra <[email protected]>
Link: http://lkml.kernel.org/r/2EF88150C0EF2C43A218742ED384C1BC0FC83D6B@IRVEXCHMB08.corp.ad.broadcom.com
Signed-off-by: Ingo Molnar <[email protected]>
There's a few awkward printk()s inside of scheduler guts that people
prefer to keep but really are rather deadlock prone. Fudge around it
by storing the text in a per-cpu buffer and poll it using the existing
printk_tick() handler.
This will drop output when its more frequent than once a tick, however
only the affinity thing could possible go that fast and for that just
one should suffice to notify the admin he's done something silly..
Signed-off-by: Peter Zijlstra <[email protected]>
Cc: Linus Torvalds <[email protected]>
Cc: Andrew Morton <[email protected]>
Link: http://lkml.kernel.org/n/[email protected]
Signed-off-by: Ingo Molnar <[email protected]>
When a runqueue has rt_runtime_us = 0 then the only way it can
accumulate rt_time is via PI boosting. That causes the runqueue
to be throttled and replenishing does not change anything due to
rt_runtime_us = 0. So avoid that situation by clearing rt_time and
skip the throttling alltogether.
Signed-off-by: Peter Zijlstra <[email protected]>
[ Changelog ]
Signed-off-by: Thomas Gleixner <[email protected]>
Link: http://lkml.kernel.org/n/[email protected]
Signed-off-by: Ingo Molnar <[email protected]>
When a runqueue is throttled we cannot disable the period timer
because that timer is the only way to undo the throttling.
We got stale throttling entries when a rq was throttled and then the
global sysctl was disabled, which stopped the timer.
Signed-off-by: Peter Zijlstra <[email protected]>
[ Added changelog ]
Signed-off-by: Thomas Gleixner <[email protected]>
Link: http://lkml.kernel.org/n/[email protected]
Signed-off-by: Ingo Molnar <[email protected]>
Current the initial SCHED_RR timeslice of init_task is HZ, which means
1s, and is not same as the default SCHED_RR timeslice DEF_TIMESLICE.
Change that initial timeslice to the DEF_TIMESLICE.
Signed-off-by: Hiroshi Shimamoto <[email protected]>
[ s/DEF_TIMESLICE/RR_TIMESLICE/g ]
Signed-off-by: Peter Zijlstra <[email protected]>
Link: http://lkml.kernel.org/r/[email protected]
Signed-off-by: Ingo Molnar <[email protected]>
This issue happens under the following conditions:
1. preemption is off
2. __ARCH_WANT_INTERRUPTS_ON_CTXSW is defined
3. RT scheduling class
4. SMP system
Sequence is as follows:
1.suppose current task is A. start schedule()
2.task A is enqueued pushable task at the entry of schedule()
__schedule
prev = rq->curr;
...
put_prev_task
put_prev_task_rt
enqueue_pushable_task
4.pick the task B as next task.
next = pick_next_task(rq);
3.rq->curr set to task B and context_switch is started.
rq->curr = next;
4.At the entry of context_swtich, release this cpu's rq->lock.
context_switch
prepare_task_switch
prepare_lock_switch
raw_spin_unlock_irq(&rq->lock);
5.Shortly after rq->lock is released, interrupt is occurred and start IRQ context
6.try_to_wake_up() which called by ISR acquires rq->lock
try_to_wake_up
ttwu_remote
rq = __task_rq_lock(p)
ttwu_do_wakeup(rq, p, wake_flags);
task_woken_rt
7.push_rt_task picks the task A which is enqueued before.
task_woken_rt
push_rt_tasks(rq)
next_task = pick_next_pushable_task(rq)
8.At find_lock_lowest_rq(), If double_lock_balance() returns 0,
lowest_rq can be the remote rq.
(But,If preemption is on, double_lock_balance always return 1 and it
does't happen.)
push_rt_task
find_lock_lowest_rq
if (double_lock_balance(rq, lowest_rq))..
9.find_lock_lowest_rq return the available rq. task A is migrated to
the remote cpu/rq.
push_rt_task
...
deactivate_task(rq, next_task, 0);
set_task_cpu(next_task, lowest_rq->cpu);
activate_task(lowest_rq, next_task, 0);
10. But, task A is on irq context at this cpu.
So, task A is scheduled by two cpus at the same time until restore from IRQ.
Task A's stack is corrupted.
To fix it, don't migrate an RT task if it's still running.
Signed-off-by: Chanho Min <[email protected]>
Signed-off-by: Peter Zijlstra <[email protected]>
Acked-by: Steven Rostedt <[email protected]>
Cc: <[email protected]>
Link: http://lkml.kernel.org/r/CAOAMb1BHA=5fm7KTewYyke6u-8DP0iUuJMpgQw54vNeXFsGpoQ@mail.gmail.com
Signed-off-by: Ingo Molnar <[email protected]>
There's too many sched*.[ch] files in kernel/, give them their own
directory.
(No code changed, other than Makefile glue added.)
Signed-off-by: Peter Zijlstra <[email protected]>
Signed-off-by: Ingo Molnar <[email protected]>